亚洲欧洲综合在线,床戏在线观看亚洲一区啪啪啪,日韩精品性生活一,在线免费观看AV一区

Your Current Location :HomeNewsCompany News  ? Metal detector installation precautions

Service Hotline

+86 13711845437

Manager Zhang

Metal detector installation precautions

Source: Time:2022-08-08 15:35:20 views:

The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

1. Installation conditions of metal detector


Install this device in a location that meets the following conditions.

? Places where the temperature is not lower than 0°C and not higher than 40°C.

? Places with humidity in the range of 30~85% and no condensation.

? There is no direct sunlight, and there are no heating appliances such as stoves and heaters nearby.

? The fluctuation range of power supply voltage does not exceed ±5%.

? Away from vibration sources, places that are not prone to vibration.

? A place with less dust.

? Places without volatile flammables, corrosive gases and salt water.

? Places where the hot and cold air of the air conditioner does not blow directly against the equipment.



2. Precautions for installation of metal detector


The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

Please do not wire in multiple directions. If a heavy object is placed on the power cord, it will crush the cord and cause a fire or electric shock.

The power cord should be kept away from heating appliances. Before unplugging the power plug, you should turn off the power switch and pull out by holding the plug.

When this equipment is connected (connected) to other equipment (front and rear conveyors, etc.), malfunction may occur. In this case, please do not connect with other equipment and ground it separately.



3. Adjustment of the plane height of the conveyor belt between the metal detector and the front and rear devices


Adjust the plane height between the equipment and the front and rear conveyor belts to the same level. There should be no gaps between the device's foot bolts and the ground to avoid shaking. After adjustment, the brake nut must be tightened with a wrench.



4. Connection of power supply and grounding of metal detector


To avoid danger, install a circuit breaker in the middle of the power supply to this equipment. Also, if it is used in a humid environment, an earth leakage circuit breaker should be installed.

To avoid electric shock and ensure stable operation of this equipment, the power plug must be grounded. (Use a soft copper wire with a diameter of 1.6mm or a metal wire with equivalent strength that is not easy to corrode. The grounding impedance must be less than 100 ohms.)
Links
亚洲一区二区三区AV无码| 欧美久久精品一级c片| 中文字幕一区二区人妻痴汉电车| 91国自产精品中文字幕亚洲| 久久熟妇人妻午夜寂寞影院 | 无码国产精品一区二区免费式芒果| 无码人妻一区二区无费| 太原市| 性欧美xxxxx乱极品少妇| 久久久成人免费视频| 亚洲精品啪啪啪| 欧美在线色| 无码爆乳超乳中文字幕在线| 77777_亚洲午夜久久多人| 国模无码一区二区三区不卡 | 久久综合色之久久综合| 漂亮的保姆3国语版在线观看| aa级女人大片喷水视频免费| 美女爽到高潮嗷嗷嗷叫免费网站| 久久久精品| 性中国熟妇| 婷婷久久综合| 国产一区二区三区在线看 | 99国产精品久久久久久久成人| 久久久久久综合网天天| 望城县| 策驰影院| 新绛县| 免费一本色道久久一区| 色翁荡息又大又硬又粗视频| 国产成人精品久久一区二区| 辛集市| 免费无毒永久AV网站| 欧美一进一出抽搐大尺度视频| 丰满老熟妇好大bbbbb| 中文字幕精品亚洲一区| 久久人人97超碰超国产| 九九在线中文字幕无码| 国产黄色精品| 精品人妻系列无码人妻不卡| 三级特黄|